Technical issues in BBMP Building Bye-Laws -1
A maximum area of 60% of available FAR can be built on the receiving plot subject to setback norms Setback is the space left on all the
Engineers must clear BBMP test to give gyan bbmp setback rules A maximum area of 60% of available FAR can be built on the receiving plot subject to setback norms Setback is the space left on all the bbmp welfare BBMP mandates specific setback requirements for the construction of houses to ensure proper ventilation, light, and overall safety Maximum
bbmp trade license fees online payment In BBMP Bye-Laws, FAR increases as the site area increases That means the lower class
Regular
price
199.00 ₹ INR
Regular
price
Sale
price
199.00 ₹ INR
Unit price
/
per